April 2, 2025 at 6:07 AM · Shared with: your neighborhood

Did you know your board voted to replace 18 streetlights at a cost of $150,000?

Only problem is….they aren’t all defective - only 4 are. We have $20,000 in reserves for the lights. Our reserve funds are woefully underfunded and our board continues to spend money on unnecessary infrastructure. It’s the board’s job to manage these costs and our current treasurer, and infrastructure committee chair, is pushing for the replacement of all 18 lights and a possible special assessment for all homeowners. About $163 per home was the number I heard thrown around.

In July of 2024 I was solely responsible for auditing the 18 streetlights and reported directly to the committee chair.

Picture #1 & #2 is the failed light on Augusta.

Picture #3 & #4 are the damaged lights on sawgrass.

Picture #5 is Bayhill. Note that the streetlights are placed every other house. There are 12 streetlights total. Also notice they are fully functional since the board recently paid Tony to fix them. Now they are going to pay Tony to replace them. Sigh.

Picture #6 shows a typical streetlight placed in dirt or gravel.

Picture #7 shows a problematic streetlight set in the grass.

Picture #8 shows a streetlight placed on a concrete pad.

Picture #9 is the estimate for the streetlights. There is only one estimate.

Picture #10 is a fun photo of the GC flushing the lines with shrimp shells.

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

March 22, 2025 at 8:51 AM · Shared with: your neighborhood · No longer on Nextdoor

Audio Recording of Unit Owner’s Meeting

Does anybody have access to the audio from the unit owner’s meeting? I have young children and had a tennis match to attend. Tried contacting property management (PM) but they were NOT present and didn’t record.

Meeting minutes must to be produced within 30 days but without the audio to cross-check the minutes this can lead to…purposeful inaccuracies.

As the person who brought the $522,000 deal (from two developers) to the board I find it frustrating that I can’t get source information from the organizers.

Had this been a sanctioned “town hall” our property management’s attendance would have been mandatory and PM would have recorded the meeting and produced the meeting notes. The meeting was scheduled with the express knowledge that PM could not attend and all administrative functions fell to the board member who recently quit in public huff only to return to the board a week later with a technicality (resignations requires a written letter per our Bylaws).

This is the same board member whose supporters caused such a disruption that LCSO was called to the subsequent meetings and property management AND legal will no longer attend board meetings in person. Three board members quit in less than 8 months. Two in 2024. One in 2025. Two quit in 2023. If you’re not part of the clique you are considered persona non grata.

Now, this single board member is in possession of the recording and is creating the corresponding meeting minutes.

I would have expected the “person” who recorded the meeting to forward the audio to PM for distribution but this is not the case. So much for transparency.

Any help would be appreciated. Especially from those who signed the petition or went door-to-door.

If you haven’t heard it yet… request the audio from the 1/22/25 board meeting from PM at daytonvalley@fsrnevada.com

Fast forward to the end. It’s a hoot. 🦉

Photo from the postPhoto from the post

March 20, 2025 at 8:24 AM · Shared with: nearby neighborhoods

Unit Owner’s Meeting - Dayton Valley HOA

Does anyone have an update on the unit owner’s meeting last night? None of the original committee members were invited so I’m interested in the spin from last night. My take is that this was a candidate’s forum disguised as a community discussion.

Why were the cops there? That’s the second time in just a few weeks that LCSO has “kept the peace” at a board meeting. What a waste of taxpayer money. Three deputies were at the February meeting.

Why is the one board member back? They quit in a huff at the January meeting after being removed as president - but they are still on the board.

Why wasn’t property management present? Why did the planners schedule on a date they knew FSR couldn’t attend? NRS states the board shall decide the date of an owners meeting.

We are 2 years from receiving the money. The agreement isn’t signed. Why are we having a meeting now?

2 board members quit in 2024. 1 board member quit in 2025. Elections are around the corner. Deadline for candidate submission is tomorrow…the “forum” was yesterday. Coincidence?

Photo from the postPhoto from the post

March 19, 2025 at 12:50 PM · Shared with: nearby neighborhoods

COMMITTEE MINUTES FROM COMMUNITY OUTREACH DEVELOPERS MEETING

QUESTIONS FOR THE “PANEL”
1. How does recorded document #522345 (Grant of Access and Utility Easement) affect combined use of our roads. See attached.
2. Does Legado HOA have access to all our roads with no duty to maintain?
3. Is Legacy 49 part of Legado HOA?
4. Why would a developer who owes us nothing AND has full access to all our roads give us $322,500?!!?
5. What does Legacy 49 want from DVCA and what happens if we don’t give it to them besides losing the money?

6. Will DVCA have to pay 30% tax on the money if the money isn’t used for gates? What did our CPA say?
7. If the monies are placed in reserves, and we pay 30% tax, how does this help our community since reserve funds can’t be used for new purchases?

8. Why was the committee disbanded although the “workshop” / negotiation with Silverado hasn’t happened and the monies from Legacy 49 aren’t received?

9. Will the panel members disclose their position on the installation of gates or the expansion of La Costa Cir @ Stonehaven?

See comments below for committee report from 8/28/2024.

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

March 18, 2025 at 10:32 AM · Shared with: nearby neighborhoods

LAWYERS, GATES AND MONEY

www.legacy49.com

Hi everyone. I haven't given an update in a few months on the Legacy 49 project. As you may have heard the project was approved last week. The Legacy 49 project is the other half of our community that was approved in 2005 by Lakemont homes. The original plan was to have a hotel casino and a second golf course. The hotel is replaced with 129 homes and the golf course will become a landscaped drainage basin.

Recently, a few homeowners passed around a petition to force a “unit owners meeting”. There will be a “panel” and homeowner questions will be asked and answered. The only problem? The entire meeting is planned by those who 1) don’t want gates or 2) don’t want the new development. There were 8 people on the now disbanded committee that secured $322,500 from DVP and had a tentative deal for no less than $200,000 from Silverado.

I am no longer involved with the board or the committee. The meeting on Wednesday will be held without the liaison or the committee chair present. At the time I quit the committee we had commitments for $522,000 from both developers.

THE GOLF COURSE
The golf course needs more homes to be successful. Joe Wade and Ed Johanson of Lakemont homes took the course public in the 2000’s and changed the $30,000 membership fee to a few hundred bucks a month. They knew the course needs about 3,000 homes in close proximity to thrive.

DVCA HOA
Our HOA needs the course to remain open. Everybody can see the state of the course. Although it’s improving the course needs investment in infrastructure. Tour specs bought the entire course for a mere $2MM in 2020. The course suffers from 30 years of deferred maintenance under several owners.

LEGADO HOA
Legacy 49, “Village 9” and “Point Legado” are all part of Legado HOA. The developer planned on 2,500 homes but only 200 were built. At $65/month the reserves are woefully underfunded. The HOA is declarant controlled by Silverado Homes. The HOA takes in $13,000 a month although the landscaping contract and property management eats most of the funds. Without the developer kicking in money the private roads can’t be maintained.

QUAIL RIDGE
The exterior foundation of Quail Ridge is washing away because the streets drain into dirt gutters on the perimeter of the development. The footings of the exterior fence are exposed.

AIRPARK
This HOA is missing 75% of the homes.

RANCHOS
When Lakemont was building “village 9” they dug a large trench out in the field to prevent flooding of the new development off the roundabout. This trench diverts water from the alluvial fan into a ditch that delivers the water to DVR @ Sutro. In the last few years Webstraunt’s 60,000 sq ft. warehouse sends all the water coming down the hill into this trench amplifying the problem. All this water causes flooding in the Ranchos.

DAYTON VALLEY INVESTORS / LAKEMONT HOMES
DVI and Lakemont acquired the DVCC property in 1998 after Lawrence went bankrupt. These companies were owned by Joe Wade and Ed Johanson.

ATLAS DEVELOPMENT
Also, in 2008, all of the surrounding land was transferred to Atlas. This is the land trust of the Fisher-Price toy empire. Most empty lots you see on DVR are owned by Atlas. Airpark’s unbuilt land is owned by Atlas.

LD LOTS / SILVERADO HOMES
When Lakemont went bankrupt in 2008 the bank wouldn’t sell the property back to Joe and Ed. A new entity called “LD Lots” was created with new investors. They purchased 200 “improved” lots for $1MM. They also purchased an additional 256 “paper” lots for $1MM. Later they bought the 50 lots on Stonehaven for $1mm. Silverado homes was created by Joe and Ed and LD Lots sold exclusively to Silverado. All the “improved” and “paper” lots are built with one large lot left off the Palmer roundabout. Silverado has agreed in principle to pay $1,000/home paid at COE.

DAYTON PARTNERS NO. 1
This the new developer in town. They have agreed to $322,500 paid at map recordation. They are building “Legacy 49”.

LEGACY 49
This is the other half of our community envisioned when the course went public. It has homes, a commercial zone, community center, hotel, RV park and features landscaped basins that will prevent flooding of the Ranchos and driving range. The basins will be a jewel in our community allowing you to hike, bike, exercise and picnic all on 70+ acres of basins with trees and shrubs. These trails extend from Sutro to Palmer.

THE FUTURE
The funniest thing about those who post about the development on Nextdoor is how far they lag behind. What happens when the course is successful? Example: the golf course is three APN’S: The clubhouses, the course and the maintenance shed. The golf course’s old and new country club are zoned “commercial” - not golf course. This means the old country club could be demolished and a Top Golf facility built.

OPINION
The Legacy 49 development is coming. Trying to fight it now is waaaaay too late. I’ve been communicating with the developer, commissioners, sewer and planning for two years. Legacy 49 will improve all our lives with the green spaces we have been promised for decades. New homes will improve the course’s finances. A small commercial zone just past Palmer will offer a cafe, coffee shop, a doggie day care and a “child learning center”. No more empty field with bonfires and motorcycles.

EASEMENT
Lyon county recorded document #522345 gives LD Lots, Silverado and Legado HOA full access to ALL our roads with “no duty to maintain”. This document was set in stone in 2015 by DVI who owned all easement rights to our roads. DVCA has a “duty to maintain” clause in our CC&Rs - that’s why we just spend $450,000 for slurry sealing.

GATES
The real argument here is about gating our community. Everyone who live close to the Bayhill gate is adamant the gate not be left open all day. “Some” of the same people turn around and say “no new gates on La Costa and Cypress Point”. There are 1,900 homes coming with 200 Silverado homes off Palmer Dr. When Minor ranch and Quicili ranch sell there will be two more bridges and 4,000 homes. If the course is successful the increased traffic to the country club will undoubtedly cause more vehicles on our roads. LCSO will not enforce ANY traffic laws on our streets (except DUI) including reckless driving, speeding and camping in your car/RV. The HOA cannot tow any car without due process - which takes time.

ROADS
Lakeview Dr. will eventually connect to Lakes Blvd. near the water department. When the new bridges are built DVCA will become a shortcut to DVR heading east.

LA COSTA CIR
At the end of La Costa is a “fire road” that connects to Stonehaven. “Some” people who object to gates live near this road. They don’t want gates because they don’t went the dead-end road to go through.

VOTE
All homes within 500’ of the proposed gates AND the fire road must vote as part of neighbor impact. If these majority of these homes don’t want improvements they won’t happen. This means a few dozen neighbors control if gates are even applicable.

ROAD/LANDSCAPING MAINTENANCE
Eventually we need to make arrangements with the Legado HOA to help pay for ongoing maintenance of our roads. You can’s stick the bill on Silverado or DVP1 because these developers will close shop after they are done building. Only the Legado HOA can be bound to a long term contract since they are the only surviving entity.

3/19/2025 MEETING
Currently there are 5 board members. Four of them were committee members along with three homeowners. The “planners” have not reached out to most committee members including the homeowners.

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

March 1, 2025 at 11:05 AM · Shared with: your neighborhood

Flashback Friday – In 2007, the board met with the developer to discuss issues within the DVCA, particularly concerning the fences and gates.

All related documents are publicly available on the DVCA website.

2007 BOD Director Quote: The Board represents the homeowners and their desires with regard to the Community. We were all sold our homes with the promise that this was a Gated Community. With the Community standing at almost 700 homes, people want the gates closed. We are experiencing higher incidences of crime in the form of burglary, vandalism, and property damage. Proposal was sought and made to have a modified closure of the gates 24/7. The public would still have access during the day through an automatically opening gate.

2007 BOD Director Quote: Since 2004 we have been asking for these internal gates. Since early 2005, we have been told that they are in the budget but we get excuses ranging from "its on the designers table" to "Clubhouse is top priority" to "economic times are tight" to "we are waiting for money to be released that is being held by the County".

2007 BOD Director Quote: The answer to all this is that if the Developer had done what he promised to do, there would be no issue. The Community would have its internal gates at Cypress Point and at LaCosta/Royal Troon which controls access to the Residential areas and would more closely define our Community as the gated Community which sold to us.

2007 Homeowner Quote: Again, I ask this board to take action as soon as possible to ensure that this becomes a truly gated community and meet the promises made by the developer and independent contractors who sold these homes as being part of a gated community. The residents of DVCA will never be truly secure in their homes until the fence is complete and gates are working.

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

February 14, 2025 at 6:41 AM · Shared with: your neighborhood

FLASHBACK FRIDAY!

Did you know that since the inception of the golf course community we have had a social committee? In the first few decades it was officially sanctioned by the board. Some of you older members may remember getting a visit with a welcome letter and a gate remote. It went dormant after the housing crash in 2008 and was infrequent between 2015-2020.

The social committee was resurrected during the days of Covid by two homeowner volunteers. Here is the February 2023 edition of the newsletter.

Have a nice day.

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

February 12, 2025 at 3:53 PM · Shared with: your neighborhood

The pictures attached are the code of conduct for the DVCA HOA.

It’s more than just words. This governing document was created 3 years ago. It cost our HOA a lot of money to make. I wasn’t on the board during its inception, but I was a volunteer.

The code of conduct has a mechanism to resolve disputes. It sets a series of rules and ties them back to the Nevada laws that oversee common interest communities, like our HOA. It is a governing document, which means it applies to all of us who are elected to the board or volunteer on a committee.

The code of conduct was also supposed to prevent board disfunction from flowing out into the public. Complaints are considered private and are adjudicated by the board - a jury of our peers. If you want to make a scene, well… go outside of the standard mechanisms and file a TPO.

This disfunction has been going on for years. The only commonality is the executive branch. The same people do the same things. I had a plan in 2024 to bring over $500,000 into our coffers ($322,500 is confirmed in the new PUD released only days ago - see last pic) and it went swimmingly, until August when we started to disagree. Seven months has transpired since the committee presented the recommendations to the board. Why has there been no Townhall? Why is there no discussion of the possibilities? Why would executive stop this?

The real story is how we will use the funds to improve our community. Homeowners have gone door-to-door and collected enough signatures to have a unit owner’s meeting. The board could have agreed to have town hall with a quick vote, but…no. Now the owners are demanding a meeting - and rightfully so.

I was the liaison who brought together all of the committee members. I was one of eight people, including four homeowners, who spoke with the developers about the possibilities of improving our community. I was one of the authors of the committee recommendations from July 2024 regarding the development next door and the opportunities available to us. I am also a proponent of transparency and community involvement.

Some of the loudest complainers don’t want gates. This is a conversation that our community should have. It’s a conversation that we should all be a part of. If you lived at the end of a dead-end road that would now be opened to thru-traffic, would you fight tooth and nail to prevent it? Would you act like you are against free gates but, in fact, you are against your road going through? Would you hold up a vote of 350 homeowners who use La Costa to access their home and might want gates that cost us nothing?

1,950 homes are coming as part of the development. It may take 13 years to build all of it, but it’s coming. Bulldozers could be plowing that field in 6 months. At the end of next year, you could be sitting in a coffee shop/cafe near the first hole.

For those who live on Lakeview, you might not be aware that it becomes a county road at Airpark. In time, that road will connect to Lakes blvd and the afternoon traffic from the warehouse will take a shortcut through our community on the way to the second bridge. Sure hope Google doesn’t route a 80,000 pound container truck on Lakeview to the 650,000 sq ft. Webstauraunt distribution center located directly behind us. Our roads can’t take that weight.

I have closed the discussion since this all belongs in the family. The people screaming the loudest are the ones who disrupted the last board meeting. You should have been noticed by now that the upcoming board meeting will be “hybrid”. This means that management (and some board members) no longer feel safe coming to our board meetings. I didn’t do that. Those weren’t my supporters.

If you haven’t listened to the audio from the meeting…well don’t. The president was demoted and chaos ensued.

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

January 18, 2025 at 1:29 PM · Shared with: anyone · No longer on Nextdoor

Top Ten Carson City locations for 911 calls in 2024

Number One: Carson Tahoe Hospital campus, 1600 Medical Parkway

Number Two: Walmart shopping center, 3200 Market Street

Number Three: Mills Park, 1111 E. William Street

Number Four: The Carson Nugget, 507 N. Carson Street

Number Five: Smith’s Grocery and Pharmacy, 599 E. William Street

Number Six: Parkway Plaza Apartments, 20 College Parkway

Number Seven: Carson Tahoe Health Specialty Medical Center, 775 Fleischmann Way

Number Eight: Gold Dust West Casino, 2171 E. William Street

Number Nine: Carson City Library, 900 N. Roop Street

Number Ten: Costco Wholesale, 700 Old Clear Creek Road

Honorable Mention: Eagle Valley Golf Course, 3999 Centennial Park Drive

https://www.carsonnow.org/01/17/2025/top-ten-carson-city-locations-for-911-calls-in-2024

January 18, 2025 at 4:16 AM · Shared with: anyone · No longer on Nextdoor

Intermittent lane reductions are coming to sections of U.

S. 50 in Dayton at the end of January.

According to the Nevada Department of Transportation (NDOT), the reductions will occur on sections of U.S. 50 between SR341 and Fortune Drive between 9 a.m. and 2:30 p.m. on weekdays between January 21 and January 31.

One-lane reductions in one-mile sections will happen while NDOT fills age-related cracking of the roadways to make driving surfaces smoother.

NDOT says that they have future plans to resurface aging roadways on an adjoining section of U.S. 50 from Fortune Drive to east of Chaves Road, along with intersection and turn improvements in years to come.

Road maintenance schedules are subject to change, and possible lane reductions may be seen on nearby sections of U.S. 50 in the upcoming weeks, depending on the weather.

Drivers are advised to expect delays and plan for extra travel time

https://www.2news.com/news/local/intermittent-lane-reductions-coming-to-sections-of-u-s-50-in-dayton/article_1cc82436-d43c-11ef-8a13-9bb9c0f2a2dd.html

https://www.dot.nv.gov/projects-programs/u-s-50-east-of-dayton-preservation-project

Photo from the post

January 14, 2025 at 7:14 AM · Shared with: your neighborhood

Blast from the past.

“CYPRESS POINT” homes were built on Cypress Point Dr, St Andrews, Grayhawk and Stonehaven. “SENDERO” is on Ballybunion. “ROYAL TROON” is now called “POINT LEGADO”. “MIRA VIDA” was the planned senior community next to Point Legado. There are two different “AIRPARK” properties - inside the Palmer gate (Airpark Estates) and off Lakes Blvd (Dayton Valley Airpark).

Photo from the post

December 14, 2024 at 6:39 AM · Shared with: anyone · No longer on Nextdoor

Legacy 49 Parks and Open Spaces

The Legacy 49 project, planned for the open lot next to the golf course, feature acres of open spaces with verdant landscaping. The golf course may be an Arnold Palmer designed but there are no parks or trails. Better amenities were always planned for the other half of our community known as “Legado”.

The basins will be maintained by the county using a special tax on the Legacy 49 properties. This tax is called a “Landscaping Improvement District” or LID. The basins are complete with parks, trails and cart paths. The golf course will supply the LTTW used by the LID to maintain the copious amount of trees and shrubs that line the basins.

There is also a buffer around Quail Ridge that pushes the RV park away from the backyards. This area is also highly landscaped with trails and cart paths.

As of today we only have the artists drawings of the basins. Many people don’t know that Point Legado has a stormwater basin with trails. It’s not landscaped like the basins in Legacy 49 but it does give an idea as to what they look like.

1. Legacy 49 Basin
2. Same
3. Same
4. Point Legado Basin
5. Same
6. Same
7. Same
8. Same
9. 9th “fairway” of Legado (trench is in background).
10 Same

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

December 9, 2024 at 11:32 AM · Shared with: anyone

A Horse On The Course 🐴 ⛳️

As many of you have noticed there is a band of horses that occasionally wander into the golf course and surrounding communities. I reached out to the horse preservation league to see what the volunteers are doing. As we’ve seen in the past, reporting wildlife to federal authorities has unintended consequences.

The Dayton preservation league, made up of local volunteers, is working on mending the fence and the gate that has failed between the herd management area and the industrial Park off Lakes Boulevard. In a testament to local interaction, BLM is working with these volunteers to provide materials and install a cattle guard. Instead of hauling them away, BLM has also promised to relocate the horses deep into the pine nut HMA once the fence and gate repairs are complete. Fun fact: Wild horses are owned by BLM. It looks like fixes will be ready by year’s end.

No need to call our horse preservation volunteers unless you see the horses in immediate danger.

Please remember these are wild animals and they spook easily. Keep your distance. No feeding or watering the horses.

Horse 🐴 poop 💩 lotto 💰 rules apply…If they poop in front of your house, you have to clean it up. 😃

Pictures.

1. Hole in fence / missing gate.
2. Gate laying on side
3. HMA
4. Band behind industrial park
5. Same
6. Map for reference
7. Plane on approach
8. Horses on Palmer Dr at night
9. HMA map
10. BLM description of Pine Nut HMA

https://wildhorsepl.org/about-us/#:~:text=The%20Wild%20Horse%20Preservation%20League,Interior%2C%20Bureau%20of%20Land%20Management.

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

December 6, 2024 at 7:55 AM · Shared with: your neighborhood · No longer on Nextdoor

Legacy 49 Update

Hi everyone. I've been a little amiss on my posts about Legacy 49 - The other half of our development that was planned in 1984, approved in 2004 and is almost ready to break ground in 2024.

Here are the latest renderings from Legacy 49. I included the overall map, the basins. the commercial zone (with the small strides child learning center) and some of the housing elevations. Some homes feature a 2nd story with external stairs for guests visiting your home.

The Lyon County utilities office, along with our County Manager, issued a pause on the issuance of will-serve letters for sewer. This stopped about $270MM worth of projects in Dayton as the issues were worked out. The county has undone most of the edicts and work has resumed. Sewage discharge capacity needs to be increased over the next 18 months.

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

November 16, 2024 at 7:09 AM · Shared with: anyone · No longer on Nextdoor

Dayton Sewer Will-Serve Moratorium Lifted

For those who care…the sewer moratorium has been lifted. All of the developments around us are years from overwhelming the system. The original moratorium was ill-conceived as there was an no immediate risk of overflow or failure. The south wastewater plant (near the golf course) can also take 200,000 gallons a day if needed. Spraying the water for dust control or taking effluent by truck to their other wastewater facility in Silver Springs were proposed. David said the Silver Springs facility is functioning well and can take additional effluent.

During the meeting on 11/15 David Bruketta (the Lyon County employee who runs the sewer plants) stated that they found some temporary solutions to dispose of the effluent in the short term and felt comfortable allowing building to continue.

As a result of these temporary solutions, the County will allow building permits to continue to be pulled, will allow site improvement permits to continue to be pulled, and will issue conditional will serves for final maps. They did note that developers will be required to review and sign disclaimer documents for their projects, prepared by the Lyon County DA’s office, regarding the permits and condition of the sewer system. Nobody has seen these documents yet.

The County has asked for the development community’s assistance moving forward during this temporary solution and to help with the long-term solution, so the work continues.

I’m a strong believer that you can’t stop development, but you can help guide it. There are laws in Nevada that allows developers to build AND ties the hands of local elected officials. With this knowledge, you must get involved and help to shape the developments that surround you.

Hope this helps. Note: I don’t work for any developer or contractor. I’m just a concerned homeowner like you. -Ron

=================================.

https://foxreno.com/amp/features/living-local/lyon-county-certifies-2024-election-results-also-lifts-building-pause

“In addition to certifying the election results, the Board addressed a critical issue in Dayton related to effluent disposal. After receiving an update from Lyon County Utilities Director David Bruketta on a short-term solution to increase sewer service capacity, the Board voted unanimously to lift the temporary pause on building permits, will-serve letters, site improvement plans, and final maps in the area.”

“The plan includes developing a reclaimed water and effluent management strategy to utilize treated effluent for dust control and transport it to other approved disposal sites if necessary.”

“As part of the decision, developers will be required to sign a Disclosure Agreement to ensure transparency in addressing capacity constraints. Commissioners expressed gratitude for the development community’s collaboration with county staff in finding creative solutions to the issue”

Photo from the post

November 11, 2024 at 8:19 PM · Shared with: anyone · No longer on Nextdoor

https://www.carsonnow.org/story/11/08/2024/lyon-county-commissioners-discuss-rib-failure-and-other-items-during-thursday-s-mee

Aspen Creek Rapid Infiltration Basins (RIBs)
Lyon County Manager Andrew Haskin addressed the background and actions taken to address the Aspen Creek Rapid Infiltration Basins (RIBs) effluent disposal challenges during his County Manager report. Mr. Haskin reported “…I want to assure the Board and the public that the life, health, and safety of the citizens of Lyon County is our top priority. I know from past experience working with this Board through the 2023 flooding that protecting life, health and safety is your priority as well and I want to thank the Board for your continued trust in me and the Lyon County team as we work through these issues. Any decisions that are made [regarding effluent disposal] are made with life, health, and safety in mind.”

The BOCC will discuss and possibly approve recommendations for processing planning applications, site improvement plans, and building permits in the Dayton sewer service area during a special meeting on Friday, November 15, 2024 at 9:00AM while Lyon County staff work to identify solutions for increased effluent disposal capacity. The agenda for the special meeting is posted on the Lyon County website.

November 8, 2024 at 11:57 AM · Shared with: your neighborhood · No longer on Nextdoor

Legado HOA / Village 9 Landscaping Overhaul

The landscapers are pulling all the weeds along Legado’s part of Palmer and replacing the rock. It also looks like you had a recent crack seal of your roads.

What does Silverado know that we don’t?

Photo from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the postPhoto from the post

November 7, 2024 at 6:40 AM · Shared with: your neighborhood · No longer on Nextdoor

Roadwork Begins Today.

Please keep cars off streets in the golf course community.

Photo from the post

October 29, 2024 at 10:13 AM · Shared with: anyone

Lyon County is scheduling a meeting on Tuesday, October 29, 2024 at 3:00pm to discuss effluent disposal and possible solutions with the development community.

The meeting will be held in the Lyon County Commission Chambers located at 27 S. Main Street, Yerington, NV. 89447, or via Zoom using the following Zoom information:

Join Zoom Meeting
https://us02web.zoom.us/j/82738967130?pwd=unvqAo8iBFEriw8gnoKc7AByvPIHr7.1

Meeting ID: 827 3896 7130
Passcode: 468031