I’ve attached a local story from 2008.
By this time, Palmer had been extended to the roundabout and “Village 9” was beginning construction. The “adjacent land” mentioned in the article is now owned by Red, Ltd and earth moving is slated to start soon. The board approved meeting with the new developer sometime this month.
The issue of who is the “successor and assigns” of Palmer Dr has never been established and Silverado claims this right since they need access to build their “landlocked” new homes by the roundabout (the developments are known as “village 10” and “village 14” and will have about 440 homes).
Dayton Valley Investors promised DVCA would be gated when the Casino was built (opposite the country club). Now that the casino has been replaced with a senior community the original agreements should be met. Also promised: a roundabout on Moore Ave.
FYI: “Dayton Valley Investors” is Lakemont Homes (which became Silverado Homes).
Picture #1 and #2 are the “easement” documents filed with the county. Picture #3 and #4 shows RED’s development and picture #5 shows Silverado’s village 14. Note that Silverado’s property can be seen in picture #3/4 as the empty land in the middle of the picture. Picture #6 is a recorded document showing the promised roundabout on Moore Ave. Pictures #7-9 show the 2005 proposed gate sites and the timeline (“built with hotel resort”). Picture #10 shows the 2023 proposed gate sites.
Legacy 49 (RED’s project) and Village 10/14 (Silverado’s project) are all part of Legado HOA but are separate developments. Silverado requires access to Palmer Dr. while Legacy 49 can always use DVR.
https://www.nevadaappeal.com/news/2008/nov/22/roads-become-an-issue-for-legado-homeowners-associ/